Service |
This is the systematic approach and tools we use to deliver projects. |
Retro Commissioning is the process of evaluating an existing building for the purpose of
improving energy efficiency to reduce carbon footprint, reduce operating costs, and
ultimately improve occupancy comfort. A-Tec has developed a Retro-Commissioning process
that brings true value to our Clients by which critical factors negatively influencing
Facility performance are identified and cost effective alternatives proposed. The aim of
Retro-Commissioning always being to bring about immediate building performance improvements
whilst the building is occupied with minimal or no disruption to operations. |
Post Construction Stage |
- Prepare Commissioning Data for O&M
- Collate Test Documentation
- Review Final O&M Manuals
- Final Commissioning Report
- Coordinate Post Construction System Reviews
|
Post Occupancy |
- Occupant Satisfaction Review
- Operational Data Review
- System Alarm Review
- Spot Check Commissioned Test Values
|
Design Document Review |
- Commissioning Authority collates design information.
- Design Intent, Owners Requirements, Drawings
- Design documents reviewed for;
- Commissionability
- Constructability
- Maintainability
- Report produced and Issued to Design Team with recommendations for improved commissioning,
construction or maintenance
- Report issued & stored on Dome Connect
- Updated to reflect design changes and subcontractor submissions
|
Commissioning Plan |
- Commissioning logic diagrams developed for all systems.
- Systems Interfaces Identified
- Commissioning sequence defined
- Civil Defence Requirements Identified
- Logic reviewed with design team
- Logic used to develop commissioning programme
- Draft Commissioning Programme created.
- Logic, durations & sequence agreed.
|
Methodology |
- Draft Commissioning method statements created
- Integrated system testing method statement created
- All documents published and managed through Dome Connect
|
Plan & Coordinate Commissioning |
- Using commissioning plan & methodology developed in Design Stage.
- System progress schedules created
- Linked to the commissioning programme through Dome Connect
- Live, on-line detailed commissioning progress reporting through Dome Connect.
- Commissioning progress reporting through Dome Connect
- Progress forecasting
- Earned Value measured for commissioned systems
- Configurable for whole project or individual systems.
- Dome Consulting use an “Authority To Proceed” process (ATP) to control the quality
assurance & coordination of commissioning activities.
- Each stage is controlled to ensure that all of the relevant documentation and testing from
the previous stage has been completed.
|
Commissioning Meetings |
- Meetings chair by Dome Consulting project manager
- Minutes produced and published for record on Dome Connect
|
Witness, Review & Approve Testing |
- Testing status is recorded on Dome Connect progress schedules
- Dome Consulting review test documents
- Test Results signed, scanned and loaded onto Dome Connect for record
|
Training, Handover & O&M |
- Training provided during final commissioning stages.
- Additional training through 3D drawing applications. (subject to design information)
- Asset information collated & reviewed
- Documentation status monitored through Dome Connect
- Detailed schedules of handover information for the Client
|
Commissioning Data for O&M |
- Final O&M’s reviewed through Dome Connect
- Asset information Available for PPM system
- O&M Documentation status monitored through Dome Connect
- Handed to client at handover
|
Final Commissioning Report |
- System reviews published on Dome Connect.
- Building information published on Dome Connect
- Post completions reviews of test documentation on Dome Connect
|
Post Occupancy Reviews |
- Occupant Satisfaction Review
- Operational Data Review
- System Alarm Review
- Spot Check Commissioned Test Values
|
Using the retained data in Dome Connect, the building and documentation can be reviewed
periodically against a known baseline |